DOT HQ Replacement Moveable Bollards

Estimated Value: $550,000
Closing Soon 4 days left Constructionrfp
Aug 5, 2026
Sep 7, 2026 3:00 PM
Construction
rfp
236220
AI Summary
This bid is for construction services to replace an existing hydraulic bollard system, including 27 hydraulic bollards and associated control equipment, at the DOT HQ East building loading dock.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design-bid-build construction services for hydraulic bollard system replacement 1 lot $200,000.00 $200,000.00 Construction
Hydraulic bollards (heavy-duty, crash-rated) 27 each $10,000.00 $270,000.00 Construction
Associated equipment for hydraulic bollard system (e.g., hydraulic power units, pumps, reservoirs, piping, wiring) 1 lot $50,000.00 $50,000.00 Construction
Control system for hydraulic bollards (e.g., PLC, control panel, sensors, software integration) 1 lot $30,000.00 $30,000.00 Construction
Estimated Bid Value$550,000.00

Want the full details?

Sign up free to see contact info, and the original bid posting link.

Sign Up Free →

Related Bids

Browse More Bids

Construction BidsRFP BidsClosing Soon All Bids