GAOA Star Meadows MEP, Repairs, & Utility Installations

Estimated Value: $125,000
Archived Washington DCConstructionrfp
This bid is closed — responses were due September 2, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Washington DC →
Aug 5, 2026
Sep 2, 2026 9:00 PM
Construction
rfp
238220
AI Summary
This bid is for the complete operational assembly and installation of various mechanical, electrical, and plumbing (MEP) systems, including heating, propane, water, and sewer utilities, for the GAOA Star Meadows project.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Hydronic Heating System Installation 1 lot $35,000.00 $35,000.00 Construction
Air Heating and Distribution System Installation 1 lot $25,000.00 $25,000.00 Construction
Propane Service Installation 1 lot $15,000.00 $15,000.00 Construction
Propane Fireplaces Installation 2 each $3,500.00 $7,000.00 Construction
Water Supply System Installation 1 lot $25,000.00 $25,000.00 Construction
Sewer Drain System Installation 1 lot $18,000.00 $18,000.00 Construction
Estimated Bid Value$125,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 7 documents, contracting-officer contacts and AI response outlines.

📎 C04d_Attachment_4_Drawings_1240BH26Q0050.pdf View
📎 C04f_Attachment_6_General_Decision_MT20260032_07282026.pdf View
📎 C04c_Attachment_3_Specifications_1240BH26Q0050.doc View
+4 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in Washington DCConstruction BidsRFP BidsClosing Soon All Bids