| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| New Campus Chiller Plant Construction (Civil, Structural, Architectural) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Chiller Units (e.g., Centrifugal or Screw Chillers) | 3 | each | $1,500,000.00 | $4,500,000.00 | Construction |
| Cooling Towers | 3 | each | $300,000.00 | $900,000.00 | Construction |
| Pumps (Chilled Water, Condenser Water) | 6 | each | $75,000.00 | $450,000.00 | Construction |
| Piping and Valves (Chilled Water, Condenser Water, Make-up Water) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Electrical Distribution System (Switchgear, Transformers, Panels, Wiring) | 1 | lot | $1,200,000.00 | $1,200,000.00 | Construction |
| Building Management System (BMS) / Controls Integration | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Instrumentation and Sensors | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Insulation (Piping, Equipment) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Startup, Testing, and Commissioning Services | 1 | lot | $700,000.00 | $700,000.00 | Professional Services |
| Estimated Bid Value | $15,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.