Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology

Estimated Value: $450,000
Open 8 days left VirginiaConstructionsolicitation
Aug 6, 2026
Sep 11, 2026 8:30 PM
Construction
solicitation
238220
AI Summary
This bid is for a construction project to extend chilled water service from a primary chiller in Building 31 to Buildings 42 and 43, allowing the existing chillers in those buildings to be bypassed during normal operation.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Chilled water piping installation (main line from Building 31 to Buildings 42/43) 1 lot $150,000.00 $150,000.00 Construction
Connection and integration of chilled water system to Building 42 HVAC 1 lot $100,000.00 $100,000.00 Construction
Connection and integration of chilled water system to Building 43 HVAC 1 lot $100,000.00 $100,000.00 Construction
Bypass valving and controls for existing chillers in Building 42 and 43 1 lot $50,000.00 $50,000.00 Construction
Engineering and design services for chilled water extension 1 lot $50,000.00 $50,000.00 Professional Services
Estimated Bid Value$450,000.00

Want the full details?

Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.

📎 659-24-203_SALISBURY_CHILLED_WATER_DRAWINGS_100_BID_DOCUMENTS-STAMPED-.pdf View
📎 659-24-203_100_BD_SPECS_CHILLED_WATER_SALISBURY_NC.pdf View
📎 36C24626B0039_1_.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in VirginiaConstruction BidsSOLICITATION BidsClosing Soon All Bids