| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Culvert Repair - Mobilization and Demobilization | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Traffic Control and Management | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Erosion and Sediment Control Measures | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Excavation and Backfill for Culvert Repair | 1500 | cubic yard | $75.00 | $112,500.00 | Construction |
| Culvert Pipe Replacement/Repair (e.g., Reinforced Concrete Pipe, Corrugated Metal Pipe) | 100 | linear foot | $1,000.00 | $100,000.00 | Construction |
| Headwall/Wingwall Repair or Replacement | 2 | each | $30,000.00 | $60,000.00 | Construction |
| Riprap or Scour Protection Installation | 200 | ton | $150.00 | $30,000.00 | Construction |
| Dewatering and Diversion Pumping | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Asphalt Pavement Repair/Replacement | 500 | square yard | $70.00 | $35,000.00 | Construction |
| Site Restoration and Landscaping (Seeding, Mulching) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Quality Control and Testing | 1 | lot | $15,000.00 | $15,000.00 | Professional Services |
| Project Management and Supervision | 1 | lot | $50,000.00 | $50,000.00 | Professional Services |
| Contingency (approx. 20% of subtotal) | 1 | lot | $157,500.00 | $157,500.00 | Other |
| Estimated Bid Value | $750,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.