REMOVE AND REPLACE EXISTING FAILED BOILER SYSTEM, USCG STATION SHINNECOCK, HAMPTON BAYS

Estimated Value: $125,000
Archived MassachusettsConstructionrfp
This bid is closed — responses were due August 18, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Massachusetts →
Aug 10, 2026
Aug 18, 2026 9:00 PM
Construction
rfp
238220
AI Summary
This bid is for the complete removal and replacement of a failed boiler system at the USCG Station Shinnecock, including all necessary labor, materials, equipment, and disposal.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Removal of existing failed boiler system 1 lot $15,000.00 $15,000.00 Construction
Disposal of existing failed boiler system and associated materials 1 lot $5,000.00 $5,000.00 Construction
New commercial boiler system (furnish and install) 1 each $50,000.00 $50,000.00 Construction
Associated piping, valves, controls, and accessories for new boiler system 1 lot $20,000.00 $20,000.00 Construction
Labor for installation and commissioning of new boiler system 1 lot $25,000.00 $25,000.00 Construction
Permits, inspections, and project management 1 lot $10,000.00 $10,000.00 Professional Services
Estimated Bid Value$125,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 5 documents, contracting-officer contacts and AI response outlines.

📎 3_30241PR260000012SOW.docx View
📎 SF1413REVOCT2023.pdf View
📎 7_30241PR260000012WR.pdf View
+2 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in MassachusettsConstruction BidsRFP BidsClosing Soon All Bids