| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Electrical Utility Installation (including trenching, conduit, wiring, pedestals, and main service connection) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Water Utility Installation (including trenching, piping, connections, and spigots) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Sewer Utility Installation (including trenching, piping, connections, and dump stations) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Site Preparation and Grading for Utility Installation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Permitting and Project Management for Utility Installation | 1 | lot | $75,000.00 | $75,000.00 | Professional Services |
| Estimated Bid Value | $750,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.