COOP House Furnace Replacement at West Fork Lake

Estimated Value: $15,500
Archived KentuckyConstructionsolicitation
This bid is closed — responses were due September 3, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Kentucky →
Aug 19, 2026
Sep 3, 2026 2:00 PM
Construction
solicitation
238220
AI Summary
This bid is for the removal of existing HVAC equipment and the installation of a new 4-ton variable speed heat pump system, including an air handler and electric heat kit, at the COOP House at West Fork Lake.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Removal of existing HVAC equipment 1 lot $1,000.00 $1,000.00 Construction
4-ton variable speed heat pump 1 each $6,000.00 $6,000.00 Construction
Air handler for 4-ton system 1 each $2,500.00 $2,500.00 Construction
Electric heat kit for HVAC system 1 each $500.00 $500.00 Construction
Labor for HVAC installation (including all necessary services) 1 lot $5,000.00 $5,000.00 Construction
Materials and equipment (excluding major HVAC components listed above) for installation 1 lot $500.00 $500.00 Construction
Permits and inspections 1 lot $500.00 $500.00 Construction
Estimated Bid Value$15,500.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.

📎 index.pdf View
📎 PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf View
📎 doc_8628a6663fbcdd9b784084c3f3904801.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in KentuckyConstruction BidsSOLICITATION BidsClosing Soon All Bids