Portal Replacement & Door Frame Reconstruction

Estimated Value: $300,000
Closed South CarolinaConstructionsolicitation
Aug 19, 2026
Sep 3, 2026 7:00 PM
Construction
solicitation
236220
AI Summary
This bid is for the replacement of three ADA security portals and reconstruction of door frames within the NPTU Security Building. Contractors need to provide all labor, supervision, materials, equipment, tools, transportation, and permits to complete the removal of existing portals and the necessary reconstruction.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Removal of existing ADA security portals 3 each $2,500.00 $7,500.00 Construction
Installation of new ADA security portals 3 each $60,000.00 $180,000.00 Security
Door frame reconstruction (per portal location) 3 each $15,000.00 $45,000.00 Construction
Labor and supervision for portal replacement and door frame reconstruction 1 lot $30,000.00 $30,000.00 Construction
Materials for portal replacement and door frame reconstruction (excluding portals) 1 lot $15,000.00 $15,000.00 Construction
Equipment and tools for portal replacement and door frame reconstruction 1 lot $7,500.00 $7,500.00 Construction
Transportation for materials and equipment 1 lot $5,000.00 $5,000.00 Transportation
Permits (as required) for construction work 1 lot $10,000.00 $10,000.00 Professional Services
Estimated Bid Value$300,000.00

Want the full details?

Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.

📎 DKGV_1160823_Portal_Replacement-_Door_Frame_Reconstuction_Draft_Statement_of_Work.pdf View
📎 DKGV_1160823_Portal_Replacement-_Door_Frame_Reconstuction_Attachment_1_Special_Conditions.pdf View
📎 DKGV_1160823_Portal_Replacement_-_Door_Frame_Reconstuction_Attachment_2_Door_Drawing.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in South CarolinaConstruction BidsSOLICITATION BidsClosing Soon All Bids