| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition and site preparation for Cath Lab installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Structural modifications and framing for Cath Lab equipment support | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Electrical rough-in and power distribution for Cath Lab equipment | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| HVAC modifications and ductwork for Cath Lab environment | 1 | lot | $45,000.00 | $45,000.00 | Construction |
| Plumbing and medical gas rough-ins (if required for Cath Lab) | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Finishes (flooring, walls, ceiling) for Cath Lab suite | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Fire suppression and life safety system modifications | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Project management and supervision for Cath Lab site preparation | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Estimated Bid Value | $350,000.00 | ||||