| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Roadway Grading and Resurfacing | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Pothole Repair and Patching | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Shoulder Repair and Maintenance | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Drainage Ditch Cleaning and Repair | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Vegetation Management (Mowing, Brushing) | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Signage Repair and Replacement | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Guardrail Repair and Maintenance | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Traffic Control Services (as needed) | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Emergency Roadway Response and Repair | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Estimated Bid Value | $500,000.00 | ||||
Sign up free to see the agency name, 9 documents, contact info, and the original bid posting link.