| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Full Mission Ship Simulator Projection System Life Cycle Replacement (Overall Project) | 1 | lot | $1,200,000.00 | $1,200,000.00 | IT Hardware |
| High-Resolution Projectors (for simulator) | 10 | each | $50,000.00 | $500,000.00 | IT Hardware |
| Projection Screens/Surfaces (for simulator) | 1 | lot | $150,000.00 | $150,000.00 | IT Hardware |
| Video Processors/Image Generators (for simulator) | 1 | lot | $200,000.00 | $200,000.00 | IT Hardware |
| Mounting Hardware and Infrastructure (for projectors/screens) | 1 | lot | $50,000.00 | $50,000.00 | IT Hardware |
| Cabling and Connectivity (fiber optic, HDMI, etc.) | 1 | lot | $30,000.00 | $30,000.00 | IT Hardware |
| System Integration and Configuration Services | 1 | lot | $100,000.00 | $100,000.00 | IT Services |
| Installation Services (on-site) | 1 | lot | $70,000.00 | $70,000.00 | IT Services |
| Testing and Commissioning Services | 1 | lot | $30,000.00 | $30,000.00 | IT Services |
| Training for USMMA Personnel | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Project Management Services | 1 | lot | $50,000.00 | $50,000.00 | Professional Services |
| Estimated Bid Value | $1,200,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 8 documents, contracting-officer contacts and AI response outlines.