| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Site preparation and excavation for utility trenches | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Installation of electrical distribution system (conduits, wiring, panels, pedestals) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Installation of water distribution system (pipes, connections, spigots) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Installation of wastewater collection system (sewer lines, connections, lift stations if needed) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Installation of communication infrastructure (e.g., fiber optic or coaxial cable for internet/TV) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Final grading, backfilling, and site restoration | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Estimated Bid Value | $750,000.00 | ||||