H--FOBU-INSTALL FIRE SUPPRESSION SYSTEM

Estimated Value: $750,000
Open 11 days left WyomingConstructionrfi
Aug 31, 2026
Sep 14, 2026 7:00 PM
Construction
rfi
236220
AI Summary
This bid is for water system improvements at Fossil Butte National Monument to upgrade the existing infrastructure to meet current fire protection requirements, primarily focusing on the installation of a new fire suppression system.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design and Engineering Services for Fire Suppression System 1 lot $75,000.00 $75,000.00 Professional Services
Permitting and Regulatory Compliance Services 1 lot $15,000.00 $15,000.00 Professional Services
Excavation and Site Preparation for Water System Improvements 1 lot $50,000.00 $50,000.00 Construction
Installation of New Fire Suppression System (Piping, Sprinklers, Valves) 1 lot $250,000.00 $250,000.00 Construction
Installation of New Water Main/Distribution Piping for Fire Protection 1 lot $150,000.00 $150,000.00 Construction
Installation of Fire Hydrants and Associated Connections 5 each $8,000.00 $40,000.00 Construction
Installation of Fire Pump and Control System (if required) 1 each $60,000.00 $60,000.00 Construction
Water Storage Tank Modifications or New Installation (if required) 1 lot $50,000.00 $50,000.00 Construction
Testing, Commissioning, and Certification of Fire Suppression System 1 lot $25,000.00 $25,000.00 Professional Services
Site Restoration and Landscaping 1 lot $35,000.00 $35,000.00 Construction
Estimated Bid Value$750,000.00

Want the full details?

Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.

📎 Sources_Sought_2.docx View
Sign Up Free →

Related Bids

Browse More Bids

Bids in WyomingConstruction BidsRFI BidsClosing Soon All Bids