Z2DA--589A4-25-102, Install Dedicated Pharmacy Air Handler

Estimated Value: $250,000
Open 8 days left KansasConstructionsolicitation
Aug 31, 2026
Sep 11, 2026 7:00 PM
Construction
solicitation
236220
AI Summary
This bid is for the installation of a dedicated air handler system specifically for a pharmacy, likely involving all associated construction, HVAC, electrical, and control work.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Dedicated Pharmacy Air Handler Unit (AHU) 1 each $75,000.00 $75,000.00 Construction
HVAC System Installation (ductwork, piping, insulation, controls) 1 lot $80,000.00 $80,000.00 Construction
Electrical System Installation (power, wiring, panels, safety devices) 1 lot $35,000.00 $35,000.00 Construction
General Construction Services (framing, drywall, finishes, structural modifications) 1 lot $40,000.00 $40,000.00 Construction
Project Management and Engineering Services 1 lot $20,000.00 $20,000.00 Professional Services
Estimated Bid Value$250,000.00

Want the full details?

Sign up free to see the agency name, 21 documents, contact info, and the original bid posting link.

📎 Final_Drawings_Part-3.pdf View
📎 Final_Drawings_Part-2.pdf View
📎 Final_Drawings_Part-1.pdf View
+18 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in KansasConstruction BidsSOLICITATION BidsClosing Soon All Bids