| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Pool Replacement (including demolition, excavation, new pool structure, plumbing, filtration, and finishes) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| HVAC System Replacement (including demolition of old system, new HVAC units, ductwork, controls, and installation) | 1 | lot | $120,000.00 | $120,000.00 | Construction |
| General Labor (skilled and unskilled for pool and HVAC replacement) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Construction Materials (for pool and HVAC, e.g., concrete, rebar, piping, insulation, electrical components) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Construction Equipment Rental/Use (e.g., excavators, lifts, tools) | 1 | lot | $3,000.00 | $3,000.00 | Construction |
| Qualified Supervision (project management, site supervision) | 1 | lot | $2,000.00 | $2,000.00 | Professional Services |
| Estimated Bid Value | $350,000.00 | ||||