DOT HQ Replacement Moveable Bollards

Estimated Value: $750,000
Archived Constructionrfp
This bid is closed — responses were due September 9, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids →
Sep 8, 2026
Sep 9, 2026 3:00 PM
Construction
rfp
236220
AI Summary
This bid is for construction services to replace an existing hydraulic bollard system, including 27 hydraulic bollards and all associated equipment and controls, outside the East building three-bay loading dock at the DOT HQ.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design-bid-build construction services for hydraulic bollard system replacement 1 lot $250,000.00 $250,000.00 Construction
Hydraulic bollard (heavy-duty, crash-rated) 27 each $15,000.00 $405,000.00 Construction
Associated equipment and control system for hydraulic bollards (e.g., hydraulic power units, control panels, sensors, wiring, conduit, trenching, drainage) 1 lot $95,000.00 $95,000.00 Construction
Estimated Bid Value$750,000.00

Want the full details?

Sign up free to see the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.

Sign Up Free → Already have an account? Log in

Browse More Bids

Construction BidsRFP BidsClosing Soon All Bids