This bid is closed — responses were due September 21, 2026.
It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
This bid is for the removal of an existing bulkhead crane bus rail system and the installation of a new four-bar, 500-amp aluminum bus rail system with three-phase, 480V power and ground at the Captain Anthony Meldahl Locks and Dam.
Line Items
Item
Qty
Unit
Est. Unit Price
Est. Total
Category
Removal of existing Bulkhead Crane bus rail system
1
lot
$30,000.00
$30,000.00
Construction
Furnish and install new four-bar, 500-amp aluminum bus rail system (three-phase, 480V power with ground)
1
lot
$100,000.00
$100,000.00
Construction
Labor for bus rail system replacement
1
lot
$15,000.00
$15,000.00
Construction
Equipment for bus rail system replacement
1
lot
$5,000.00
$5,000.00
Construction
Estimated Bid Value
$150,000.00
Want the full details?
Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.