| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design and Construction of 7,900 feet High-Pressure Waterline | 1 | lot | $6,000,000.00 | $6,000,000.00 | Construction |
| 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and asphaltic seal coat | 7900 | feet | $150.00 | $1,185,000.00 | Construction |
| Associated valves and fittings for 8-inch DIP | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Upgrade existing control system to add SCADA to newly installed system | 1 | lot | $750,000.00 | $750,000.00 | IT Services |
| Portable Hoist for Pump and Motor Maintenance | 1 | each | $50,000.00 | $50,000.00 | Construction |
| New 15,000-gallon tank | 1 | each | $300,000.00 | $300,000.00 | Construction |
| Booster pumps for 15,000-gallon tank (installed prior to PS2) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| New 5,000-gallon tank at SOR site | 1 | each | $200,000.00 | $200,000.00 | Construction |
| Pre-packaged pump station at SOR site | 1 | each | $1,000,000.00 | $1,000,000.00 | Construction |
| Estimated Bid Value | $10,250,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 17 documents, contracting-officer contacts and AI response outlines.