| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Troubleshooting, repair, and/or replacement of Tail Engine Burner and associated ignition systems | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Troubleshooting, repair, and/or replacement of Wheel Well Burner and associated ignition systems | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Troubleshooting, repair, and/or replacement of Flight Deck Burner and associated ignition systems | 1 | lot | $18,000.00 | $18,000.00 | Construction |
| Troubleshooting, repair, and/or replacement of Cargo Area Burner and associated ignition systems | 1 | lot | $22,000.00 | $22,000.00 | Construction |
| Repair or replacement of burner ignition components (general) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Replacement of malfunctioning cargo-area sprinkler head and drainage restoration | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Structural steel repairs and corrosion remediation beneath aircraft mock-up | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Corrosion repair beneath flight-deck stairs and around door assemblies | 1 | lot | $12,000.00 | $12,000.00 | Construction |
| Repair and/or replacement of warped R2 door | 1 | each | $7,000.00 | $7,000.00 | Construction |
| Repair and/or replacement of warped grating near cargo-fire area | 1 | lot | $4,000.00 | $4,000.00 | Construction |
| Certified welding and associated aircraft mock-up repairs | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Installation/restoration of emergency energy shutoff capability at propane storage area | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Installation of required solenoid valve(s) in LPG/propane distribution system | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Correction of deficiencies involving legacy pneumatic shutoff valves | 1 | lot | $6,000.00 | $6,000.00 | Construction |
| Required control-system repairs/upgrades | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Associated maintenance, testing, and corrective actions for complete and functional system | 1 | lot | $18,000.00 | $18,000.00 | Construction |
| Estimated Bid Value | $220,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 10 documents, contracting-officer contacts and AI response outlines.