| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of existing hydronic boiler and associated components | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| New hydronic boiler (commercial grade, suitable for building heating) | 1 | each | $35,000.00 | $35,000.00 | Construction |
| Associated boiler components (e.g., pumps, valves, piping, expansion tanks, safety devices) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Installation of new hydronic boiler and associated components | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Control programming and integration (for new boiler system) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Commissioning of new boiler system | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Onsite system operating training | 1 | lot | $5,000.00 | $5,000.00 | Professional Services |
| Disposal and hauling fees for old boiler and debris | 1 | lot | $3,000.00 | $3,000.00 | Facilities |
| Mobilization (personnel, equipment, tools, transportation) | 1 | lot | $4,000.00 | $4,000.00 | Construction |
| Estimated Bid Value | $120,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 11 documents, contracting-officer contacts and AI response outlines.