| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design-Build Construction Contract for Runway Control Structure Rehabilitation and Modernization | 1 | lot | $3,500,000.00 | $3,500,000.00 | Construction |
| Structural Steel Realignment | 1 | lot | — | — | Construction |
| Exterior Masonry Repair | 1 | lot | — | — | Construction |
| Roof Weatherproofing | 1 | lot | — | — | Construction |
| Interior Reconfiguration | 1 | lot | — | — | Construction |
| HVAC Ductwork Installation/Update | 1 | lot | — | — | Construction |
| Electrical System Updates | 1 | lot | — | — | Construction |
| Specialized Equipment Cabinetry | 1 | lot | — | — | Construction |
| Estimated Bid Value | $3,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 12 documents, contracting-officer contacts and AI response outlines.