| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Shower replacement (entire unit, including pan and wall surround) | 15 | each | $7,000.00 | $105,000.00 | Construction |
| Isolation valve installation | 7 | each | $350.00 | $2,450.00 | Construction |
| Investigation and repair of leaking ADA shower pan drain (Men's locker room) | 1 | job | $1,500.00 | $1,500.00 | Construction |
| Proflo or equivalent fiberglass shower pans | 15 | each | $500.00 | $7,500.00 | Construction |
| Shower wall assemblies (cementitious backer board, liquid-applied waterproofing, new wall surround to match pan) | 15 | each | $1,500.00 | $22,500.00 | Construction |
| Patching/replacement of existing ceramic tile around shower stalls | 15 | job | $700.00 | $10,500.00 | Construction |
| Dumpster and equipment staging area (provided by USCG) | 1 | lot | — | — | Facilities |
| Personnel, equipment, tools, transportation, supervision | 1 | lot | — | — | Professional Services |
| Estimated Bid Value | $150,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.