| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition of existing showers and associated finishes | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| New shower units (e.g., pre-fabricated stalls, tile showers) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Plumbing rough-in and finish fixtures (showerheads, valves, drains) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Waterproofing and substrate preparation for new showers | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| New wall finishes (tile, FRP, etc.) in shower areas | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| New flooring in shower areas (e.g., slip-resistant tile) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Painting and patching of adjacent walls and ceilings | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Electrical work (e.g., lighting, exhaust fans, GFCIs) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| HVAC modifications (e.g., exhaust fan installation/replacement) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| General contractor services (project management, supervision, coordination) | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Estimated Bid Value | $250,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.