| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction of Munitions Maintenance and Inspection (M&I) Facility (KNMD209085) | 1 | lot | $14,000,000.00 | $14,000,000.00 | Construction |
| Micro-pile Foundations for M&I Facility | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Cast-in-Place Concrete for M&I Facility (slab-on-grade, walls, capping beams, structural masonry) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Structural Framing & Enclosure for M&I Facility (cold-formed metal framing, insulated metal wall panels, structural steel) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Standing Seam Metal Roofing for M&I Facility (with gutters, downspouts, weather barrier) | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Mechanical HVAC Systems for M&I Facility (including specialized 20-ton AC systems) | 1 | lot | $1,200,000.00 | $1,200,000.00 | Construction |
| Interior Plumbing for M&I Facility | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Lightning/Grounding Protection for M&I Facility | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Communication Infrastructure for M&I Facility | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Fire Alarm-Mass Notification System for M&I Facility | 1 | lot | $600,000.00 | $600,000.00 | Security |
| Wet-Pipe Sprinkler Suppression System for M&I Facility | 1 | lot | $700,000.00 | $700,000.00 | Security |
| MAC Pad Construction (1,167 SY concrete pad) | 1167 | SY | $250.00 | $291,750.00 | Construction |
| Asphalt Pavement for MAC Pad Access/Egress | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Construction of Conventional Munitions Cube Storage Addition (KNMD209086) | 1 | lot | $14,000,000.00 | $14,000,000.00 | Construction |
| Micro-pile Foundations for Munitions Cube Storage Addition | 1 | lot | $900,000.00 | $900,000.00 | Construction |
| Concrete Wall Structures for Munitions Cube Storage Addition (including 12" thick walls) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Cast-in-Place Concrete Slabs for Munitions Cube Storage Addition | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Structural Steel Framing & Roof Joists for Munitions Cube Storage Addition | 1 | lot | $1,800,000.00 | $1,800,000.00 | Construction |
| Standing Seam Metal Roofing for Munitions Cube Storage Addition | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| New Asphalt Pavement for Munitions Cube Storage Addition Access | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Lightning and Grounding Protection Systems for Munitions Cube Storage Addition | 1 | lot | $400,000.00 | $400,000.00 | Security |
| Integrated Fire Detection and Alarm Reporting Systems for Munitions Cube Storage Addition | 1 | lot | $800,000.00 | $800,000.00 | Security |
| RAB Lighting Exterior Wall Packs (sole source/brand name specific) | 1 | lot | $150,000.00 | $150,000.00 | Facilities |
| RAB Lighting Area Lights (sole source/brand name specific) | 1 | lot | $200,000.00 | $200,000.00 | Facilities |
| Project Phasing and Security Gates Erection | 1 | lot | $250,000.00 | $250,000.00 | Security |
| Estimated Bid Value | $28,000,000.00 | ||||