| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Base Rock (Raw Material) | 1 | lot | — | — | Construction |
| Clean Rock (Raw Material) | 1 | lot | — | — | Construction |
| Riprap (Raw Material) | 1 | lot | — | — | Construction |
| Transportation of Raw Materials to Stockpile/Loading Yard within 20-mile radius of OZAR | 1 | lot | — | — | Transportation |
| Availability of MoDOT-compliant materials within 72 hours of BPA call | 1 | lot | — | — | Professional Services |
| Certified scales and weight tickets for material loading | 1 | lot | — | — | Professional Services |
| Suitable loading equipment for material loading | 1 | lot | — | — | Professional Services |
Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.