J--Emergency Harbison Well Pump Replacement - ROMO

Estimated Value: $35,000
Open ColoradoConstructionother
Sep 18, 2026
—
Construction
other
238220
AI Summary
This bid is for the emergency replacement of a well pump at Rocky Mountain National Park's Harbison Well, including all necessary labor, materials, and equipment for installation and commissioning.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Submersible Well Pump (e.g., Franklin Electric, Grundfos, or equivalent) 1 each $8,000.00 $8,000.00 Construction
Pump Installation Labor (including well pulling, setting, wiring, and testing) 40 hour $150.00 $6,000.00 Construction
Well Casing and Drop Pipe (replacement/repair as needed) 1 lot $3,000.00 $3,000.00 Construction
Electrical Wiring and Controls (replacement/repair as needed) 1 lot $2,500.00 $2,500.00 Construction
Crane/Hoisting Equipment Rental (for pump removal/installation) 1 day $1,500.00 $1,500.00 Construction
Mobilization and Demobilization (travel, setup, teardown) 1 lot $2,000.00 $2,000.00 Construction
Permits and Inspections (if required by local jurisdiction) 1 lot $500.00 $500.00 Professional Services
Project Management and Supervision 1 lot $3,000.00 $3,000.00 Professional Services
Contingency for unforeseen issues (e.g., well damage, additional parts) 1 lot $8,500.00 $8,500.00 Other
Estimated Bid Value$35,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.

📎 ROMO_Harbison_Well1_JOFOC_2026-09-16_1.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in ColoradoConstruction BidsClosing Soon All Bids