| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Grounding and high-level shut-off valve replacement for F-24 Tank 1 | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Grounding and high-level shut-off valve replacement for F-24 Tank 2 | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Tank catwalk platform extension | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Check valve installation on relief discharge into Tank 2 | 1 | each | $8,000.00 | $8,000.00 | Construction |
| Truck offload meter installation | 1 | each | $12,000.00 | $12,000.00 | Construction |
| Visual fuel flow indicator installation | 1 | each | $3,000.00 | $3,000.00 | Construction |
| Eyewash station installation | 1 | each | $4,000.00 | $4,000.00 | Construction |
| Filter separator maintenance platform for truck offload/fillstand | 1 | each | $18,000.00 | $18,000.00 | Construction |
| Integrated truck overfill prevention system | 1 | each | $10,000.00 | $10,000.00 | Construction |
| Integrated truck ground verification system | 1 | each | $7,000.00 | $7,000.00 | Construction |
| Protective pipe bollards installation for offload/fillstand | 1 | lot | $9,000.00 | $9,000.00 | Construction |
| Equipment shelter ground system replacement | 1 | each | $6,000.00 | $6,000.00 | Construction |
| Ground verification system for offload operations | 1 | each | $7,000.00 | $7,000.00 | Construction |
| Automatic Tank Gauging (ATG) system supply, installation, and testing for Tank 1 | 1 | each | $80,000.00 | $80,000.00 | Construction |
| Automatic Tank Gauging (ATG) system supply, installation, and testing for Tank 2 | 1 | each | $80,000.00 | $80,000.00 | Construction |
| Project Management and General Construction Services (overall project) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $395,000.00 | ||||