| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction of 100-foot-wide riparian planting bench | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Construction of gravel maintenance path along entire reach | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Creation of 200-by-1,500-foot island within Reach 4 of the lake (in water up to three feet deep) | 1 | lot | $7,000,000.00 | $7,000,000.00 | Construction |
| Planting of cottonwood trees and other culturally significant vegetation on the island | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Installation of riprap revetment on the lakeward side of the island for erosion protection | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Estimated Bid Value | $17,500,000.00 | ||||