Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement

Estimated Value: $250,000
Open New 32 days left PennsylvaniaConstructionsolicitation
Sep 24, 2026
Oct 26, 2026 4:00 PM
Construction
solicitation
238160
Small Business
AI Summary
This bid is for the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake, including rerouting pipes, installing a new gutter system, and integrating a new lightning protection system.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Complete Replacement of Standing Seam Metal Roof on Control Tower Building 1 lot $180,000.00 $180,000.00 Construction
Rerouting of Existing Vent and Exhaust Pipes through Masonry Side Wall 1 lot $25,000.00 $25,000.00 Construction
Installation of New Gutter System 1 lot $15,000.00 $15,000.00 Construction
Integration of New, Certified, Non-Penetrating Lightning Protection System 1 lot $30,000.00 $30,000.00 Construction
Estimated Bid Value$250,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.

📎 oppMgmtLink.pdf View
📎 index.pdf View
📎 PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf View
+1 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in PennsylvaniaConstruction BidsSOLICITATION BidsClosing Soon All Bids