| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Circuit Breakers (Draw Out), Inspect and Test | 1 | lot | $25,000.00 | $25,000.00 | Facilities |
| Miscellaneous System Relief Valves, 5 Year Certification | 1 | lot | $35,000.00 | $35,000.00 | Facilities |
| Talon Grid (Type 18-08), Inspect and Test | 1 | lot | $15,000.00 | $15,000.00 | Facilities |
| Deck Covering (Slip-Resistant) Stern Deck, Renew | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| Tenting (Stern Deck), Provide | 1 | lot | $10,000.00 | $10,000.00 | Facilities |
| Deck Covering (Polymeric), Repair and Seal | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Tanks (MP Fuel Service), Clean and Inspect | 1 | lot | $30,000.00 | $30,000.00 | Facilities |
| Tanks (MP Fuel Storage and Overflow), Clean and Inspect | 1 | lot | $45,000.00 | $45,000.00 | Facilities |
| Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | 1 | lot | $50,000.00 | $50,000.00 | Facilities |
| Tank (Water Mist), Clean and Inspect | 1 | lot | $20,000.00 | $20,000.00 | Facilities |
| Tanks (Water Mist), Preserve (Partial) | 1 | lot | $25,000.00 | $25,000.00 | Facilities |
| Potable Water Pneumatic Tank, Clean and Inspect | 1 | lot | $18,000.00 | $18,000.00 | Facilities |
| TCTO: Dewatering Overboard Discharge Connections, Install | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| TCTO: Potable Water FWD Hose Connection, Install | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| TCTO: Dry Provision Storeroom, Modify | 1 | lot | $70,000.00 | $70,000.00 | Construction |
| TCTO: HVAC System (Port Aft Capstan), Modify | 1 | lot | $90,000.00 | $90,000.00 | Construction |
| TCTO: Weather Deck Scuppers, Install | 1 | lot | $55,000.00 | $55,000.00 | Construction |
| MPAC Demister, Install | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Temporary Services, Provide – Cutter | 1 | lot | $100,000.00 | $100,000.00 | Facilities |
| Welding, Provide (General) | 1 | lot | $120,000.00 | $120,000.00 | Facilities |
| Fire Prevention, Provide | 1 | lot | $75,000.00 | $75,000.00 | Security |
| All necessary labor, services, supplies, materials, equipment, power, accessories, personnel, and other things as necessary (General Contract Overhead/Management) | 1 | lot | $400,000.00 | $400,000.00 | Professional Services |
| Estimated Bid Value | $1,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 12 documents, contracting-officer contacts and AI response outlines.