| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Owner-furnished equipment erection | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Drilled piers for pipe support rack | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Building slab, equipment pads, dead end foundation, gas yard foundations, and pipe support rack foundations (including excavation, concrete, testing, and backfill) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Structural steel, pipe rack steel supports, joists, decking, grating, guardrail, ladder, connections | 1 | lot | $4,000,000.00 | $4,000,000.00 | Construction |
| Structural steel connection design | 1 | lot | $500,000.00 | $500,000.00 | Professional Services |
| Elevated concrete floor slabs | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Estimated Bid Value | $15,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in