| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Installation of erosion control measures | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Implementation of traffic control (Phase 1 & 2) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Demolition of two (2) existing 60” corrugated metal pipe culverts | 2 | each | $15,000.00 | $30,000.00 | Construction |
| Demolition of existing roadway | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Grading for drainage improvement project | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Construction of 10’ x 5’ Rigid Concrete Box culverts with 9ft wingwalls | 4 | each | $200,000.00 | $800,000.00 | Construction |
| Pavement repair | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Stabilization of project site | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Estimated Bid Value | $1,100,000.00 | ||||