| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Primary and Secondary Chiller Systems (complete replacement and installation) | 2 | system | $1,500,000.00 | $3,000,000.00 | Construction |
| Chiller Skid Packages (approximately 600 tons refrigeration capacity) | 4 | package | $750,000.00 | $3,000,000.00 | Construction |
| Demolition and Removal of Existing HVAC System | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| New Electrical Feeds for HVAC Systems | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Chilled Water Pumps (new installation) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Chilled Water Piping (new installation) | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Air Handler Units (new installation) | 1 | lot | $800,000.00 | $800,000.00 | Construction |
| Automated Digital HVAC Control System (new installation and integration) | 1 | system | $1,000,000.00 | $1,000,000.00 | IT Software |
| Roof-Mounted Air-Cooled Condensers (installation, including roof penetrations and building modifications) | 1 | lot | $700,000.00 | $700,000.00 | Construction |
| New Intake and Exhaust Ducting (fire prevention) | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Fire Protection Measures at all Penetrations | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Integrated Digital Control System for HVAC and Building Fire Protection (replacing pneumatic controls) | 1 | system | $800,000.00 | $800,000.00 | IT Software |
| Mechanical and Controls Provisions for Free Cooling (passive outside air) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Modifications to Existing Intakes and Louvers | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $12,000,000.00 | ||||