AI Summary
This is a Request for Information (RFI) from the FAA seeking interested sources for the modernization of the Gillespie Field (SEE) Air Traffic Control Tower (ATCT) in El Cajon, CA. The project involves construction and is estimated to be between $2.5 million and $5 million. To win, interested parties must submit capability statements by October 14, 2026, demonstrating their ability to complete the work as described in the attached specifications and drawings.
Want the full details?
Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.
📎 SEE_ATCT_TFIP_Drawings_-_Full_Size__03.28.2025_.pdf View
📎 SEE_ATCT_TFIP_Draft_Specifications__03.28.2025_.pdf View
📎 Market_Survey_SEE_ATCT_Mod_10.02.2026.pdf View
Sign Up Free → Already have an account? Log in