| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design and Construction of Fort Sill Microgrid | 1 | project | $75,000,000.00 | $75,000,000.00 | Construction |
| 18MW Natural Gas Reciprocating Internal Combustion Engine (RICE) Power Plant (Fort Sill) | 1 | each | $25,000,000.00 | $25,000,000.00 | Energy |
| Electrical Interconnection of RICE Plant to Existing Substation (Fort Sill) | 1 | project | $3,000,000.00 | $3,000,000.00 | Construction |
| Natural Gas Pipeline Connection for RICE Plant (Fort Sill) | 1 | project | $2,000,000.00 | $2,000,000.00 | Construction |
| Modifications to Existing Electrical Substation (Fort Sill) | 1 | project | $5,000,000.00 | $5,000,000.00 | Construction |
| Microgrid Control System with Fiber Optic and Communications Infrastructure (Fort Sill) | 1 | system | $7,000,000.00 | $7,000,000.00 | Telecommunications |
| Underground Utilities and Site Work (Grading, Drainage, Pads, Access Drive, Site Lighting, Perimeter Fence) (Fort Sill) | 1 | project | $8,000,000.00 | $8,000,000.00 | Construction |
| Expansion of Camp Parks Reserve Forces Training Area (PRFTA) Microgrid and Power Generation | 1 | project | $75,000,000.00 | $75,000,000.00 | Construction |
| Natural Gas Generators (1650KW total capacity) (Camp Parks) | 1 | lot | $10,000,000.00 | $10,000,000.00 | Energy |
| 5,000KWH Battery Energy Storage System (BESS) (Camp Parks) | 1 | each | $15,000,000.00 | $15,000,000.00 | Energy |
| Microgrid System (Camp Parks) | 1 | system | $10,000,000.00 | $10,000,000.00 | Energy |
| Transformers (Camp Parks) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Energy |
| Controls and Switches (Camp Parks) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Energy |
| Medium Voltage Distribution System (Camp Parks) | 1 | system | $12,000,000.00 | $12,000,000.00 | Construction |
| Utilities and Additional Underground Electrical Distribution System (Camp Parks) | 1 | project | $8,000,000.00 | $8,000,000.00 | Construction |
| Site Improvements (Camp Parks) | 1 | project | $5,000,000.00 | $5,000,000.00 | Construction |
| Communication Infrastructure and Integration with Existing Supervisory Control and Data Acquisition (Camp Parks) | 1 | project | $7,000,000.00 | $7,000,000.00 | Telecommunications |
| Estimated Bid Value | $150,000,000.00 | ||||