| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition of existing CMU storage room within hangar space | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Comprehensive build-out of multi-functional floor plan (14,000 sq ft) | 14000 | square foot | $2,000.00 | $28,000,000.00 | Construction |
| Structural and architectural planning for second floor | 1 | lot | $1,000,000.00 | $1,000,000.00 | Professional Services |
| Construction of second floor plate | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Installation of mechanical room | 1 | each | $1,500,000.00 | $1,500,000.00 | Construction |
| Construction of restrooms (multiple) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Communication stub-ups installation | 1 | lot | $500,000.00 | $500,000.00 | Telecommunications |
| Elevator installation | 1 | each | $500,000.00 | $500,000.00 | Construction |
| Stairwells construction (multiple) | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Acoustic requirements implementation (heightened) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Network connections at workstations (5 per workstation) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Telecommunications |
| Consultation and approval from State Historic Preservation Office (SHPO) | 1 | lot | $100,000.00 | $100,000.00 | Professional Services |
| Estimated Bid Value | $38,100,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.