| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Progressive Design-Build Services for KC-46A Aircraft Beddown Infrastructure Program | 1 | lot | $235,000,000.00 | $235,000,000.00 | Construction |
| Design and Construction of KC-46A Aircraft Maintenance Hangar (General Maintenance) | 1 | each | $75,000,000.00 | $75,000,000.00 | Construction |
| Design and Construction of KC-46A Multipurpose Hangar (Corrosion Control & Open-Tank Fuel Cell Maintenance) | 1 | each | $75,000,000.00 | $75,000,000.00 | Construction |
| Design and Construction of KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion) | 1 | each | $50,000,000.00 | $50,000,000.00 | Construction |
| Design and Construction of Associated Airfield Civil Site Infrastructure | 1 | lot | $35,000,000.00 | $35,000,000.00 | Construction |
| Design Development Services for KC-46A Aircraft Beddown Infrastructure Program | 1 | lot | $15,000,000.00 | $15,000,000.00 | Professional Services |
| Preconstruction Services for KC-46A Aircraft Beddown Infrastructure Program | 1 | lot | $5,000,000.00 | $5,000,000.00 | Professional Services |
| Estimated Bid Value | $235,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.