| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction of new drinking water treatment plant (complete system) | 1 | lot | $30,000,000.00 | $30,000,000.00 | Construction |
| Raw water conveyance system | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Pressure reduction equipment | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Chemical pretreatment equipment | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Filtration system | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Filtered water storage and pumping system | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Chemical storage and metering system | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Water and sewer lines (associated with plant) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Estimated Bid Value | $35,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 7 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.