| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) Facility Construction (8,202 sq ft) | 1 | lot | $19,500,000.00 | $19,500,000.00 | Construction |
| Site Clearing and Preparation | 1 | lot | — | — | Construction |
| Utility Relocation and Connection to Base Systems | 1 | lot | — | — | Construction |
| Grade Changes | 1 | lot | — | — | Construction |
| Slab on Grade Foundation with Cold Weather-Insulated Shallow Continuous Strip Footings | 1 | lot | — | — | Construction |
| Thickened Cold Weather-Insulated Mat Foundation (below simulator equipment) | 1 | lot | — | — | Construction |
| Exterior Shell (Simulator Bay): Masonry Veneer and Metal Panel on Reinforced Concrete Masonry Units (CMU) | 1 | lot | — | — | Construction |
| Exterior Shell (Administration Areas): Masonry Veneer and Metal Panel on Metal Studs | 1 | lot | — | — | Construction |
| Low Slope Standing Seam Structural Metal Roofing with Snow Guards | 1 | lot | — | — | Construction |
| Collateral Secret Open Storage Criteria Construction (Simulator Bay and associated areas) | 1 | lot | — | — | Construction |
| Large Overhead Door (Simulator Bay) | 1 | each | — | — | Construction |
| Interior Overhead Crane (Simulator Bay) | 1 | each | — | — | Construction |
| Briefing/Debriefing Room Construction | 1 | lot | — | — | Construction |
| Mission Planning Room Construction | 1 | lot | — | — | Construction |
| Instructors' Office Construction | 1 | lot | — | — | Construction |
| Administrative Office Construction | 1 | lot | — | — | Construction |
| Building Support Rooms Construction | 1 | lot | — | — | Construction |
| Toilet Facilities Construction | 1 | lot | — | — | Construction |
| Estimated Bid Value | $19,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in