| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Excavation for oil containment basin | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Reinforced concrete walls for oil containment basin | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Reinforced concrete floors for oil containment basin | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Concrete flush splash pads | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Labor for installation of concrete basins | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Mechanical sump package (as outlined in 'List of Materials for the Oil Containment System') | 1 | each | $10,000.00 | $10,000.00 | Construction |
| Pumps for oil containment system | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Associated electrical materials for pump system | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Associated plumbing materials for pump system | 1 | lot | $7,000.00 | $7,000.00 | Construction |
| Galvanized steel bar grating | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Framing materials for concrete basin | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Estimated Bid Value | $175,000.00 | ||||