| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| C-130 Sanding Booth System (integrated with specified components) | 1 | each | $2,000,000.00 | $2,000,000.00 | Construction |
| Allen Bradley Control System (Rockwell Automation) | 1 | each | $250,000.00 | $250,000.00 | IT Hardware |
| GVS-RPB Safety Respirator System | 1 | each | $50,000.00 | $50,000.00 | Other |
| Fire Suppression System (integrated into booth) | 1 | each | $75,000.00 | $75,000.00 | Facilities |
| Ventilation System (integrated into booth) | 1 | each | $100,000.00 | $100,000.00 | Facilities |
| Dust Collection System (integrated into booth) | 1 | each | $120,000.00 | $120,000.00 | Facilities |
| Vacuum Media Removal System (integrated into booth) | 1 | each | $80,000.00 | $80,000.00 | Facilities |
| Return Air System (integrated into booth) | 1 | each | $60,000.00 | $60,000.00 | Facilities |
| Conditioned Make Up Air System (integrated into booth) | 1 | each | $90,000.00 | $90,000.00 | Facilities |
| Connected Air Shower Booth | 1 | each | $40,000.00 | $40,000.00 | Facilities |
| Training (for booth operation) | 1 | lot | $30,000.00 | $30,000.00 | Professional Services |
| Technical Data (Manuals and Drawings) | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Installation Cost (for entire booth system) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Foundation Work (for booth installation) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Cost to remove existing equipment | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Shipping (for booth system components) | 1 | lot | $100,000.00 | $100,000.00 | Transportation |
| Estimated Bid Value | $3,500,000.00 | ||||