| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| 3-Bay Aircraft Maintenance Hangar Construction (F-35 program) | 1 | lot | $62,500,000.00 | $62,500,000.00 | Construction |
| Two-story steel framed reinforced concrete aircraft hangar structure | 1 | lot | — | — | Construction |
| Slab on grade foundation | 1 | lot | — | — | Construction |
| Membrane roof system | 1 | lot | — | — | Construction |
| Aircraft Maintenance Bay Space | 1 | lot | — | — | Construction |
| Aircraft Corrosion Control Bay Space | 1 | lot | — | — | Construction |
| Aircraft Fuel Systems Maintenance Bay Space | 1 | lot | — | — | Construction |
| Wash equipment storage areas | 1 | lot | — | — | Construction |
| Radar verification system storage areas | 1 | lot | — | — | Construction |
| Singapore-unique AME storage rooms | 1 | lot | — | — | Construction |
| Singapore-unique supply storage (warehouse-type space) | 1 | lot | — | — | Construction |
| Office/admin spaces | 1 | lot | — | — | Construction |
| Shop spaces | 1 | lot | — | — | Construction |
| F-35 Autonomic Logistics Information System (ALIS) unique support space | 1 | lot | — | — | Construction |
| Centralized tool room for Singapore-specific tools and support section | 1 | lot | — | — | Construction |
| Compressed air room | 1 | lot | — | — | Construction |
| Bathrooms | 1 | lot | — | — | Construction |
| Electrical spaces | 1 | lot | — | — | Construction |
| Mechanical spaces | 1 | lot | — | — | Construction |
| Telecommunication spaces | 1 | lot | — | — | Construction |
| Janitor closet | 1 | lot | — | — | Construction |
| Incidental related work (site preparation, utilities, etc.) | 1 | lot | — | — | Construction |
| Estimated Bid Value | $62,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.