| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Aircraft Parking Apron Construction (to accommodate six large-frame aircraft) | 1 | lot | $70,000,000.00 | $70,000,000.00 | Construction |
| Shoulders for Aircraft Parking Apron | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Multiple Taxiways Construction | 1 | lot | $30,000,000.00 | $30,000,000.00 | Construction |
| Runway Connections Construction | 1 | lot | $15,000,000.00 | $15,000,000.00 | Construction |
| Utilities Infrastructure (supporting airfield) | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Airfield Lighting System | 1 | lot | $8,000,000.00 | $8,000,000.00 | Construction |
| Grading and Drainage System | 1 | lot | $12,000,000.00 | $12,000,000.00 | Construction |
| Access Roads Construction | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Site Preparation | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Type III In-Ground Hydrant Fueling System | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Estimated Bid Value | $175,000,000.00 | ||||