| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of existing concrete bridge | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Construction of 70-foot single span concrete I-girder bridge | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Construction of concrete deck for bridge | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Construction of concrete abutments for bridge | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Installation of H-pile foundations for bridge | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Estimated Bid Value | $3,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 10 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.