| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Solar Photovoltaic (PV) System Design and Engineering | 1 | lot | $500,000.00 | $500,000.00 | Energy |
| Solar Photovoltaic (PV) System Installation (Panels, Inverters, Racking) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Combined Heat and Power (CHP) System Design and Engineering | 1 | lot | $750,000.00 | $750,000.00 | Energy |
| Combined Heat and Power (CHP) System Equipment and Installation | 1 | lot | $6,000,000.00 | $6,000,000.00 | Construction |
| Microgrid Control System and Software | 1 | lot | $1,500,000.00 | $1,500,000.00 | IT Software |
| Energy Storage System (e.g., Battery Storage) Design and Installation | 1 | lot | $1,000,000.00 | $1,000,000.00 | Energy |
| Electrical Infrastructure Upgrades and Interconnection | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Project Management and Consulting Services | 1 | lot | $500,000.00 | $500,000.00 | Professional Services |
| Estimated Bid Value | $15,000,000.00 | ||||