PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

Estimated Value: $150,000
Open 29 days left IllinoisConstructionsolicitation
Oct 8, 2026
Nov 19, 2026 8:00 PM
Construction
solicitation
23822
AI Summary
This solicitation is for the fabrication and installation of a Low Conductivity Water (LCW) Piping System within the F-37 Pump Room at Fermilab. Interested parties must attend a mandatory pre-proposal meeting and site visit, requiring advance access requests and specific PPE. Proposals are due by November 19, 2026.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Fabrication and Installation of Low Conductivity Water (LCW) Piping System in F-37 Pump Room 1 lot $150,000.00 $150,000.00 Construction
Estimated Bid Value$150,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 25 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 378854_MR.pdf View
📎 EXHIBIT_25_Drawings.zip View
📎 EXHIBIT_24_Sample_Subcontract.pdf View
+22 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in IllinoisConstruction BidsSOLICITATION BidsClosing Soon All Bids