Repair Building 330 Mod 1 and 3 Underground Plumbing Break

Estimated Value: $125,000
Closing Soon 4 days left CaliforniaConstructionsolicitation
Oct 8, 2026
Oct 27, 2026 5:00 PM
Construction
solicitation
237110
AI Summary
This bid is for the repair of an underground plumbing break in Building 330, Modules 1 and 3. It involves excavation, repair of damaged plumbing, and restoration of the affected area.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Mobilization and Demobilization (Construction Equipment and Personnel) 1 lot $5,000.00 $5,000.00 Construction
Excavation for underground plumbing repair (approx. 50 linear feet, 4-6 ft deep) 50 linear foot $150.00 $7,500.00 Construction
Underground plumbing pipe replacement (e.g., PVC, cast iron, or copper, 4-6 inch diameter) 50 linear foot $200.00 $10,000.00 Construction
Fittings and connectors for plumbing repair 1 lot $2,500.00 $2,500.00 Construction
Backfill and compaction of excavated area 1 lot $4,000.00 $4,000.00 Construction
Surface restoration (e.g., asphalt, concrete, or landscaping) over repaired area 1 lot $3,000.00 $3,000.00 Construction
Plumbing inspection and testing (pressure test, visual inspection) 1 lot $1,500.00 $1,500.00 Professional Services
Project Management and Supervision 1 lot $8,000.00 $8,000.00 Professional Services
Permits and Fees (if applicable) 1 lot $1,000.00 $1,000.00 Professional Services
Contingency for unforeseen conditions (e.g., additional pipe damage, difficult soil conditions) 1 lot $80,000.00 $80,000.00 Other
Estimated Bid Value$125,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in CaliforniaConstruction BidsSOLICITATION BidsClosing Soon All Bids