| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Trenching, excavation, and site preparation along designated routes | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Installation of Government-furnished underground conduits and handholes | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Protection of existing underground utilities and surrounding infrastructure | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Backfilling, compaction, and reinstatement of disturbed surfaces | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Site safety, waste removal, and final cleanup | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Extension of existing perimeter fence posts for security cameras | 13 | each | $3,000.00 | $39,000.00 | Construction |
| Contractor-furnished materials (sand, soil, gravel, backfill, consumables) | 1 | lot | $3,500.00 | $3,500.00 | Construction |
| Estimated Bid Value | $125,000.00 | ||||