| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Complete roof replacement of existing built-up roof (BUR) insulated roof assembly with new cold-applied SBS modified bituminous insulated roof assembly meeting current energy code requirements at Kelly Power Plant Building | 1 | each | $300,000.00 | $300,000.00 | Construction |
| Replacement of all perimeter roof flashings | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Replacement of all scuppers | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Replacement of all rain leaders | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Replacement of all counter flashings at masonry wall conditions | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Estimated Bid Value | $350,000.00 | ||||